Monday, March 14, 2011

Drilling and Staining

Today we got the two 8-foot end pieces together. Each consists of two 8x10 boards screwed onto a post. In the picture they are upside-down serving as a platform for the remaining boards, which I put a second layer of stain on tonight. We moved into the garage for warmth and a flat floor. It had the bonus of also being out of the leaves and such that kept blowing and sticking to the stained boards. On the downside, I inhaled a lot of stain fumes.

Next: Screwing together the 16-foot sides and attaching it all to form a box.

No comments:

Post a Comment